# South West Water sets out Taw Torridge storm overflow works due to finish by summer 2027

> South West Water plans a pumping station, two storage tanks and a new sewer around the Taw Torridge Estuary to cut storm overflow spills near two North Devon bathing waters.

Published 17 November 2026 by The Water Wire. Topic: Environment & performance. Canonical: https://waterwire.co.uk/story/south-west-water-taw-torridge-storm-overflow-works

South West Water has set out a programme of network upgrades around the Taw Torridge Estuary in North Devon. The aim is to reduce storm overflow spills near the Westward Ho! and Saunton Sands bathing waters, according to [Waterbriefing](https://www.waterbriefing.org/home/company-news/item/26181-south-west-water-starts-major-project-to-improve-water-quality-in-taw-torridge-estuary). The announcement is not new. The [North Devon Gazette](https://www.northdevongazette.co.uk/news/environment/south-west-water-north-devon-taw-torridge-estuary-9233460) reported it on 30 September 2026. The Water Wire has not been able to read the company's own release.

## What we know

[Waterbriefing](https://www.waterbriefing.org/home/company-news/item/26181-south-west-water-starts-major-project-to-improve-water-quality-in-taw-torridge-estuary) reports the following plans:

- **Westward Ho!:** a new pumping station, due to be built this autumn, with a new sewer pipe linking it to the treatment works.
- **Northam:** work due to begin in November on a storage tank to hold extra wastewater during heavy rain.
- **Velator, Braunton:** from late 2026, a large storage tank holding up to 750,000 litres. Stored flows will be returned to the network for treatment when there is capacity.

The improvements are expected to be completed by summer 2027.

James Pearce, South West Water's Programme Director for the scheme, said the work would strengthen network resilience and support water quality at the two bathing waters. He added that the company is "spending hundreds of millions" on storm overflow performance.

The company is investing £760m over the next four years to reduce spills across its region. It says it aims to be the first in the industry to reach fewer than 10 spills per overflow per year by 2040, which it describes as "a decade ahead of the Government's deadline". The £760m is a region-wide figure. No cost has been given for the Taw Torridge scheme on its own.

## What others are reporting

The [North Devon Gazette](https://www.northdevongazette.co.uk/news/environment/south-west-water-north-devon-taw-torridge-estuary-9233460) reported the same details:

- the 750,000-litre Velator tank
- the summer 2027 completion date
- the £760m investment
- the 2040 target

The paper also reported that the announcement came less than 24 hours after South West Water was fined for pollution offences committed between January 2015 and July 2021. The Water Wire has not yet confirmed the details of that case from a primary source.

## Background

The scheme relies mainly on storage. Tanks hold excess flows during heavy rain, and the network treats them later when capacity allows. This differs from approaches that remove surface water from the sewer system altogether.

The Water Wire has not found published Environment Agency spill data for the Taw Torridge overflows. Nor has it found current bathing-water classifications for Westward Ho! and Saunton Sands to measure the scheme against.

## What to watch

- Whether the Northam and Westward Ho! works start on the timetable the company has given.
- Event Duration Monitoring data for the estuary overflows once the tanks are in operation.
- Bathing-water results at Westward Ho! and Saunton Sands after summer 2027.
- Progress across the £760m regional programme towards the company's 2040 target.

For South West Water, a company under sustained scrutiny over pollution, the Taw Torridge scheme is a visible test of whether storage-led investment produces measurable results. The North Devon Gazette's report places the announcement right after a pollution fine for historic offences. That timing helps explain why the company is foregrounding its programme.

The 2040 ambition of fewer than 10 spills per overflow is a claim that can be checked. Annual spill monitoring will show whether schemes like this one move the numbers.

Several questions remain open:

- The local scheme's cost has not been given, so its value for money cannot be judged.
- No baseline spill figures for these overflows have been cited.
- Storage tanks reduce spill frequency but do not take rainwater out of the system. Their performance in very wet years will matter.

The real measure will be bathing-water outcomes at Westward Ho! and Saunton Sands after 2027.

## Sources

- [Waterbriefing — South West Water starts major project to improve water quality in Taw Torridge Estuary](https://www.waterbriefing.org/home/company-news/item/26181-south-west-water-starts-major-project-to-improve-water-quality-in-taw-torridge-estuary)
- [North Devon Gazette — South West Water Taw Torridge Estuary project](https://www.northdevongazette.co.uk/news/environment/south-west-water-north-devon-taw-torridge-estuary-9233460)
- [watermagazine.co.uk](https://www.watermagazine.co.uk/2026/11/17/south-west-water-begins-major-project-in-north-devon-to-improve-water-quality-in-the-taw-torridge-estuary/)
